Primavera P6 for Planning and Scheduling

Primavera P6 is the global standard for managing complex construction and energy projects. It enables detailed planning, critical path scheduling, resource allocation, and cost/time tracking, supporti...

Primavera P6 for Planning and Scheduling
Course

Primavera P6 for Planning and Scheduling

SAR 899.00 599
This course includes:
  • 17h 05m 11s
  • 30 Lectures
  • 1 Downloadable resources
  • Certificate of completion
Instructor

Eng. Abdalla Yousif

Download course details
Overview

Primavera P6 is the global standard for managing complex construction and energy projects. It enables detailed planning, critical path scheduling, resource allocation, and cost/time tracking, supporting PMI standards for large-scale project control and advanced reporting.

Description

Primavera P6 is a powerful enterprise project management solution used to manage complex construction, infrastructure, and energy projects. It supports detailed planning through structured Work Breakdown Structures, logical activity relationships, and critical path analysis. The system enables planners to develop realistic schedules, identify project constraints, and maintain full visibility over project timelines.

The software also provides advanced tools for resource allocation, cost loading, and time tracking to ensure accurate project control. It aligns with PMI standards and best practices, making it suitable for large scale projects that require strict monitoring and reporting. With its strong reporting capabilities, Primavera P6 helps organizations improve decision making, control risks, and maintain performance across multiple projects.

No Modules Available

Modules will be added soon

Curriculum
9 Section - 30 Lecture - 17h 05m 11s
Section-1
1
Introduction
Video 00h 30m 01s
2
Portfolio- Program and Project
Video 00h 49m 11s
Section-2
1
Primavera Interface
Video 00h 21m 55s
2
EPS & OBS
Video 00h 56m 20s
3
Create New Project
Video 00h 28m 22s
Section-3
1
WBS Manual
Video 00h 15m 40s
2
WBS from Excel
Video 00h 11m 58s
3
Activities form Excel
Video 00h 31m 36s
Section-4
1
Layouts
Video 00h 03m 31s
2
Calendars
Video 00h 24m 03s
3
Sequence Activities
Video 00h 25m 37s
4
Estimate Activity Durations
Video 00h 23m 19s
5
Develop Schedule
Video 00h 33m 07s
Section-5
1
CPM in P6
Video 00h 48m 36s
2
Printout
Video 00h 19m 26s
3
Relationships in P6
Video 01h 12m 24s
Section-6
1
Milestone and Sequence Finalization
Video 00h 21m 41s
2
Currencies and Unite of Measure
Video 00h 08m 16s
3
Defining and Assigning Resources
Video 01h 14m 53s
Section-7
1
Resource and Duration Estimation-1
Video 00h 24m 21s
2
Resource and Duration Estimation-2
Video 00h 40m 30s
3
Importing activity durations into P6
Video 00h 23m 03s
Section-8
1
Delete Assigned Resources
Video 00h 12m 33s
2
Resources and Duration Estimation
Video 00h 16m 24s
3
Import Resources to P6
Video 00h 30m 06s
4
Resource Aggregation in P6
Video 00h 53m 15s
Section-9
1
Extracting activities from BOQ-1
Video 00h 33m 07s
2
Extracting activities from BOQ-2
Video 00h 25m 41s
3
Extracting activities from BOQ-3
Video 00h 32m 23s
4
Extracting activities from BOQ-4
Video 00h 39m 01s
Requirement
No Prerequisites
Who this Course is for:
Schedulers/Planners
Project Managers
Site/Construction Engineers
Cost Control Teams
Control Engineer

Student Reviews

0
(0 reviews)
Share: